as a condition of the sale, the buyers requested a list of 8 things that needed to be addressed before they would accept the house. Of the things on the list, we agreed to fix a leak in the dishwasher (one we never knew existing and I'm still not convinced it leaks), the leak in the bathroom upstair - found in the access through Zach's bedroom closet. I was aware of that at one time being a problem, but assumed David had fixed it long ago (obvioulsy not), fix a connection in the breaker box to correct the watts vs guage wire (? hard to explain), fix a connection in the furnace AND have the drain snaked from the house to the street starting at the pipe in the basement laundry room. There were a few other things, but these were the items we agreed to address - the rest of the list could be done when they really become an issue (like the inspector said the furnace was at the end of its life span - but it works fine and the air conditioner is also old, but it works fine, and the facia board behind the gutter will need to be replaced at the time the roof is reshingled, but its not an urgent matter at this time)
EVERYTHING went smoothly, with the exception of the drain snaking results. Bob the Drain Man hit mud. Which apparently means the pipe has collapsed and deteriorated - thus equalling the need for repair. Unfortunately for us....the floor in the basement will need to be torn up so we can even get to the pipe. Once David is in, he will have a better idea of how much pipe will need to be replaced.
David called with the following list of things to bring when I come to the house tonight:
Sledge Hammer
Shovel
Ear Protection
2 Buckets
a Chisel
Framing Hammer
the Sawzaw
he rented the Jack Hammer ------------
Can we just be done with this house already???????